Showing posts with label Sweden. Show all posts
Showing posts with label Sweden. Show all posts

Friday, December 15, 2017

A journey to Sweden, 1989: Karlskrona and Bromölla

Deutsche Version dieses Postings

The last Swedish traffic bureau where I took a photo of an interlocking panel was at Karlskrona, with its type 65 relay interlocking:

Interlocking panel, Karlskrona, 3.8.1989

Interlocking panel, Karlskrona, 3.8.1989

The departure signal is shown by the train director:

SJ Rc4 1318, Karlskrona, 3.8.1989

Where I took the following two photos I do not know:

Starting signal, where?, 3.8.1989

Signal repeater, where?, 3.8.1989

Finally, I took two quick shots of the "centralapparat" at Bromölla from the train:

Station and interlocking frame, Bromölla, 3.8.1989

Station and interlocking frame, Bromölla, 3.8.1989

In contrast to the "centralapparaten" on the mittban, this frame had many more route levers, as one can see on this enlargement:

Interlocking frame, Bromölla, 3.8.1989

And that's it—you have now seen all my photos of Scandinavian interlockings.

Thursday, December 14, 2017

A journey to Sweden, 1989: Emmaboda

Deutsche Version dieses Postings

Emmaboda had the same type of interlocking as Östersund:

Interlocking frame, Emmaboda, 3.8.1989

Once more one can see that the signals have odd numbers, whereas the points are numbered with even numbers:

Interlocking frame, Emmaboda, 3.8.1989

The station building had a typical annexe for the traffic bureau:

Station building, Emmaboda, 3.8.1989

And here is a cross brace for the overhead lines which was also used to carry a signal head:

Overhead lines, Emmaboda, 3.8.1989

Wednesday, December 13, 2017

A journey to Sweden, 1989: Nybro

Deutsche Version dieses Postings

After a layover of almost a week at Ulricehamn, we started our travel back to Austria. At a few stations, I found time to take more photos of interlocking frames. Here is the panel of the relay interlocking at Nybro:

Interlocking panel, Nybro, 3.8.1989

Interlocking panel, Nybro, 3.8.1989

Interlocking panel, Nybro, 3.8.1989

I also have a photo of the station building, but only as a side view:

Station building, Nybro, 3.8.1989

A huge tank of some sort was pulled through the station:

SJ T43 219 pulls a huge tank, Nybro, 3.8.1989

Tuesday, December 12, 2017

A journey to Sweden, 1989: Ånge

Deutsche Version dieses Postings

Two days later, we went to southern Sweden, to visit relatives of mine. In the middle of the night, we had to change trains at Ånge, after our train had arrived some 80 minutes late:

Station building, Ånge, 28.7.1989

Still (or because of this?), I had time to take two photos of the type 65 interlocking panel in the traffic bureau:

Interlocking frame, Ånge, 28.7.1989

Interlocking frame, Ånge, 28.7.1989

Monday, December 11, 2017

A journey to Sweden, 1989: Gällivare

 Deutsche Version dieses Postings

For one day, we made a sightseeing tour through Gällivare's underground ore mines. On the next day, we left southwards. While we waited for our train down the inlandsban, I took some photos at Gällivare's station:

Station building, Gällivare, 26.7.1989

A train to Stockholm arrives:

SJ Rc4 1173, Gällivare, 26.7.1989

My first shot of the interlocking frame with the train director at the controls came out blurred, unfortunately:

Interlocking frame, Gällivare, 26.7.1989

Here is the frame once more. The upper row is obviously used for clearing shunting signals and barriers, whereas the lower one contains the points levers and the route and signal levers. This type of interlocking frame has a purely electric locking logic, thus, it is not an electro-mechanical interlocking:

Interlocking frame, Gällivare, 26.7.1989

The track panel contains the indicators for signals, track circuits, route locks and, at the upper left, a large gauge for displaying the current while reversing points:

Interlocking frame, Gällivare, 26.7.1989

This picture shows the rows of levers and their labels:

Interlocking frame, Gällivare, 26.7.1989

Here is an enlargement from the previous picture, with the labels of the first few levers. From left to right, one can see the following abbreviations:
  • 7h Dvärgsignal | 7v Dvärgsignaler a,b,c,d,e,f,g,i,k och l | + 8 – Växel
  • + 10 – Växel
  • V1 Fällbommar ned | V1 Fällbommar upp | + 12 – Växel | 4–20 Lokalimläggning
  • V2 Fällbommar ned | V2 Fällbommar upp | + 14 – Växel
In English:
  • 7h shunting signal | 7v shunting signals a,b,c,d,e,f,g,i,k and l | + 8 – points
  • + 10 – points
  • V1 lower barriers | V1 raise barriers | + 12 – points | 4–20 local control
  • V2 lower barriers | V2 raise barriers | + 14 – points
On can see that on this frame type, points get even numbers and signals odd numbers:

Interlocking frame, Gällivare, 26.7.1989

How I could, finally, take one photo of this shunting engine through the rungs of a wagon in front of it, but the next one without them, I cannot remember:

SJ Ud 863, Gällivare, 26.7.1989

SJ Ud 863, Gällivare, 26.7.1989

From Gällivare, we went back to Vilhelmina for a few days, to do nothing.

Saturday, December 9, 2017

A journey to Sweden - and Norway, 1989: Narvik

Deutsche Version dieses Postings

At Abisko—far to the north of the polar circle—,we met a Swabian who was travelling to the Nordkap on a small motorized bicycle—he hat lost a bet, or wanted to win one, or something like that. And many more were on their way to the northern-most point of Europe—the number of people stepping there on each other's toes must have been (and be?) enormous. We, however, only wanted to go to Narvik, to have travelled the malmban ("ore railway") once.

At Abisko Turiststation, we slept overnight (although it was not really a night, because of the midnight sun). On the next day, this empty ore train came from Narvik:

Empty ore train, Abisko Turiststation, 24.7.1989

Empty ore train, Abisko Turiststation, 24.7.1989

At Narvik, I took this first photo of a Dm3, SJ's heavy locomotives used to haul the ore trains:

SJ Dm3 1229-1244-1230, Narvik, 24.7.1989

A shunting engine stands in front of the old, empty signal box:

LKAB 2837, Narvik, 24.7.1989

Here is the interlocking panel for controlling the line on the Norwegian side up to Abisko:

Interlocking panel, Narvik, 24.7.1989

Interlocking panel, Narvik, 24.7.1989

Interlocking panel, Narvik, 24.7.1989

A separate panel controlled the points and signals at Narvik itself. A Swedish Rc can be seed outside:

Interlocking panel, Narvik, 24.7.1989

Interlocking panel, Narvik, 24.7.1989

Here is the station building, in an unfriendly weather with light rain:

Station building, Narvik, 24.7.1989

Only one more ore train came down the grade:

SJ Dm3 1213-1237-1214 with ore train, Narvik, 24.7.1989

We went around a little to get a view on the ore unloading facilities, but we did not find the interesting locations (if there were any):

Ore unloading tracks, Narvik, 24.7.1989

Ore unloading tracks, Narvik, 24.7.1989

So we returned to the station ...

LKAB 11, Narvik, 24.7.1989

LKAB 15.2195, Narvik, 24.7.1989

... and rode back to Sweden on the next train:

Zweimal LKAB 15, Malmban, 24.7.1989

Abisko Turiststation, 24.7.1989

Driver's cabin on an electric rail car, Malmban, 24.7.1989

Malmban, 24.7.1989

SJ Rc4 1333, Malmban, 24.7.1989

SJ Dm 985-986, Malmban, 24.7.1989